Site Paperwork Every Nigerian Builder Should Keep (Free Templates)

· · 7 min read
Site Paperwork Every Nigerian Builder Should Keep (Free Templates)

Walk onto most Nigerian building sites and ask to see the records. You'll usually find a WhatsApp group, a notebook in the foreman's pocket, and a lot of memory. That works when things go well. When they don't — a labourer says he wasn't paid for Saturday, 40 bags of cement can't be accounted for, the tiler walks off halfway, or the client refuses the last payment — there's nothing to show who is right.

Keep your site records on your phone

Track My Build logs labour, materials and subcontractor payments against your budget, with photos, for free.

Try Track My Build →

You don't need software or an office to fix this. Six simple documents cover most of the disputes we hear about. Here is what each one is for, what it must contain, and a free template for each.

1. Labour Attendance & Weekly Wage Sheet

The problem it solves: "Oga, I came on Saturday." Daily-paid workers are the biggest weekly cash outflow on most sites, and the least recorded.

What it records: each worker, their trade and day rate, a mark for every day (1 for a full day, 0.5 for a half day), days worked, gross pay, any advance already given (transport, feeding money), and net pay. Each worker signs or thumbprints when paid.

As a guide, general labourers in many cities earn around ₦5,000 a day and skilled artisans more. See labour rates for all trades. Our wage sheet calculates days, gross and net pay for the week. Copy the tab each week, and your labour cost is never a guess again.

2. Subcontractor / Artisan Agreement

The problem it solves: the artisan who takes a 50% advance, works for a week and disappears, or who says "that wasn't included".

What it records: the work item by item with quantities and rates, whether it's labour-only or supply-and-fix, start and finish dates, a payment plan tied to progress (for example 40% to start, 40% when laid, 20% after snagging), materials and wastage rules, workmanship standards, what happens if they abandon the job, and a short defects period.

Never pay more than the first stage in advance. Our Subcontract Agreement works out each stage's amount from the agreed sum. If you use Track My Build, its Subcontractors tab tracks agreed vs paid vs balance for each artisan.

3. Purchase Order (LPO)

The problem it solves: the supplier who delivers 10 lengths of the wrong rod, or charges more than the price you agreed on the phone.

What it records: items, quantities, agreed prices, delivery address and date, the site contact, delivery charge, and terms: deliver only what's ordered, short or damaged items noted on the waybill, payment against invoice + waybill + PO number.

Check current prices on Material Prices before you send it. Our LPO template is pre-filled with cement, rods, binding wire and sand.

4. Material Requisition & Site Store Log

The problem it solves: leakage. Cement, rods and even blocks disappear slowly from Nigerian sites, a few at a time. Without a stock record you never know how much.

What it records: the requisition is the site asking for materials, with what's already in store and what it's for. The store log is a stock card per material: every delivery in, every issue out, who took it and what for, with a running balance.

The trick is the weekly count: count the bags in the store and compare with the balance. A gap means leakage, and you find it after a week, not after the roof. Our store log keeps the running balance for you.

5. Letter of Award

The problem it solves: a contractor who starts work on the strength of a phone call, and a client who later says the price, period or retention was different.

What it records: the contract sum, period, site possession and completion dates, retention, advance payment and its guarantee, liquidated damages for delay, the contract documents in order of priority (letter, conditions, priced BoQ, drawings, programme), and what the contractor must submit before starting. It ends with the contractor's signed acceptance.

Our Letter of Award template covers all of it. If you're the contractor, you can find and track tenders on our construction tenders page.

6. Practical Completion & Handover Certificate

The problem it solves: arguments at the end of the job. When is the building "finished"? When does retention get released? Did the client get the keys, manuals and spare tiles?

What it records: the date of practical completion, the outstanding snags and the date to finish them, when the defects period ends, a handover checklist (keys, gate remotes, as-built drawings, test certificates, manuals and warranties, spare tiles and paint from the same batch, meter numbers), and the retention sums: half released now, half at the end of the defects period.

Pair it with our Snag List, then sign it with our Completion Certificate.

Paper or Phone?

Paper works if someone actually fills it in every day. Many builders now prefer a phone: snap the waybill, log the expense, record who was paid. Track My Build does that for free, and keeps everything in one place for the owner to see. The templates give you the structure either way.

The Full Pack

DocumentFill it inPrevents
Wage sheetDaily, paid weeklyPay disputes, ghost workers
Subcontract agreementBefore each artisan startsAbandoned jobs, scope fights
LPOEvery orderWrong items, price changes
Store logEvery delivery and issueMaterial leakage
Letter of awardOnce, at awardPrice, period and retention disputes
Completion certificateOnce, at handoverRetention and "is it finished?" fights

For daily progress, add our Daily Site Report.

A Week on Site With the Paperwork

Here is how the documents fit into a normal week on a bungalow at lintel level:

  • Monday: the supervisor raises a material requisition for 120 bags of cement and 60 lengths of 12 mm rod for the lintel and ring beam. The office checks prices and sends an LPO to the supplier.
  • Tuesday to Saturday: the wage sheet is marked every morning. Each issue of cement from the store goes on the store log with who took it and what for.
  • Thursday: the delivery arrives. The storekeeper counts it against the LPO, notes 2 torn bags on the waybill, and enters 118 bags on the store log.
  • Saturday afternoon: workers are paid against the wage sheet and sign for it. The storekeeper counts the store. The log says 69 bags (40 opening − 25 issued + 118 received − 64 issued); the count is 67, so two bags are missing. That gets found out this week, not at the end of the job.

Twenty minutes of paperwork a day, and at the end of the week the owner knows exactly what was spent on labour and materials, and where.

Frequently Asked Questions

My workers can't read. Can I still use a wage sheet?

Yes. The supervisor fills it in and reads each worker's days and pay aloud on payday. A thumbprint in the signature column is as good as a signature for proving payment.

Do small jobs need a letter of award?

For a ₦500,000 repair, a signed quotation may be enough. For a whole building, always use a written award (or contract) that fixes the sum, period and payment stages. Most serious disputes come from jobs that started on a handshake.

How much retention should I hold?

Five percent of each payment is common, with half released at practical completion and half when the defects period ends (often six months). For artisans, holding the last 10–20% until snagging is done works the same way.

What if a supplier won't accept an LPO?

Many market suppliers don't use them. Send the order by WhatsApp in the same format (items, quantities, prices, delivery) and keep the message. It's your record of what was agreed.

Download the Site Paperwork Pack

Free, editable Excel and PDF: Wage Sheet, Subcontract Agreement, LPO, Store Log, Letter of Award and Completion Certificate. Or log it all in Track My Build.

See all templates →
🔔

Get building price alerts on this phone

One alert a week when cement, rods or blocks change price, or a new cost guide is out. Free, with no sign-up and no email.

Your own figure

Want an accurate cost for your own project?

Get an itemised estimate priced for your city — free, no account needed.

Calculate your building cost →