Estimator guide

How to Use the Building Cost Estimator

From your plot size to a priced estimate, BoQ and PDF: what to enter at each step, how to read the results, and the mistakes that make an estimate wrong.

1. Which estimator to use

All three use the same prices. They differ in how much you tell them and what you get back.

EstimatorBest forTimeYou get
QuickA budget figure before you talk to anyone~2 minTotals for foundation, walls & frame, roof, finishes, external works
ProfessionalContractors, QS, loans, tenders, a detailed budget5–10 minEvery material, quantity and labour line, PDF and BoQ (standard or BESMM4)
AI from your planYou already have architectural drawingsUploadThe Professional form filled in from your plan (₦5,000 per plan)
The estimator start page with three cards: Quick Estimate, Detailed Professional Estimate and AI Estimate from your plan
The start page at /estimator. Not sure? Start with Quick: you can switch to Professional any time.

2. What to have ready

  • Plot size (length × width). A standard Nigerian plot is about 100 × 50 ft (≈ 465 m²). The form works in metres; tap Feet to enter feet.
  • Number of floors. Count the ground floor: a duplex is 2.
  • The rooms on each floor (bedrooms, en-suites, toilets, kitchen, living room, store), or the floor area of each floor from your drawing.
  • Your city, so the right local prices are used.
  • If you know them: soil type (or your soil test report), the foundation your engineer recommends, and the roof you want.

Nothing is final: you can go back and change any answer, and every price on the results page can be edited.

3. Quick Estimate, step by step

  1. 1

    Project Basics

    Pick the building type (bungalow, duplex, block of flats, hotel, shopping complex and more), your city and the number of floors. "1" means the ground floor only.

  2. 2

    Size & Layout

    Enter the land length and width (switch to Feet if your plot is in feet, e.g. 100 × 50 ft). Then add the rooms on each floor, or type the floor area from your drawing.

  3. 3

    Specification

    Choose the finish: budget, standard or premium. This sets the roof, ceiling, floor tiles, paint and fittings.

  4. 4

    Key Options

    Soil type and foundation, plus extras such as fence, borehole, water tank, paving and generator house.

  5. 5

    Review & Submit

    Check the summary and get your estimate. It takes about two minutes and needs no account.

Open the Quick Estimate

4. Professional Estimate, step by step

Six steps. Every step has sensible defaults, so you only need to change what you know.

  1. 1

    Project Details

    Building type, city, land size, number of floors and the room list floor by floor (or the floor area from your drawing). For flats, enter the rooms of ONE flat and the number of flats on each floor.

    • If you type a floor area, we price that area exactly. If your rooms need more space than you typed, you will see a warning.
    • Not sure of the room sizes? Leave them on "standard": we use typical Nigerian sizes.
  2. 2

    Substructure

    Soil type, foundation type (strip, raft or pile), foundation depth, hardcore, blinding and the iron rods for the foundation.

    • If your foundation is lighter than your soil and floors usually need, the results page says so and prices the stronger one next to it. Your choice is kept.
    • Piles: enter the number, diameter and depth from your engineer if you have them.
  3. 3

    Superstructure

    Wall type and block size, partitions, columns, internal columns, suspended floor slab, staircase, doors and windows.

    • From 3 floors we suggest column bases, a ground beam and internal columns. Tick them if your structural drawings have them.
    • Door and window counts are for the whole building, not each floor. Leave them blank and we count them from your rooms: a door for each bedroom, toilet, bathroom, kitchen and store, about 1½ windows per bedroom and 3 per living room.
  4. 4

    Roofing & Ceiling

    Roof shape (gable, hip or flat), roofing sheet, pitch, timber, ceiling and gutters.

    • A flat roof is a concrete slab: pick its thickness and reinforcement in the "Flat Roof Slab" box.
    • If your top floor is smaller than the ground floor, you choose whether the roof covers the ground floor, the top floor, or a size you type.
  5. 5

    Finishes & Services

    Floor and wall tiles, plaster, paint brand and coats, electrical points, plumbing, AC units, solar and security points.

    • Paint brand changes the paint price. "Other" lets you type your own bucket price.
  6. 6

    Miscellaneous

    External works (fence, gate, paving, landscaping, septic tank, soakaway, borehole), contingency, contractor's profit and overheads, professional fees and VAT.

    • Building it yourself with direct labour? Untick the contractor markup to see the bare building cost.

Open the Professional Estimate

5. Tall buildings (5 floors and up)

As soon as you choose 5 or more floors, a note appears under Number of Floors and the estimate switches to a heavier structure:

  • columns get bigger on the lower floors, and beams are deeper;
  • floor slabs are at least 150 mm with steel bars in two layers;
  • concrete walls are added for wind bracing;
  • the stairs are priced on every floor.

For flats, hotels, offices and other shared buildings we also add lifts, fire safety, a fire escape stair and a water tank with pumps. Untick any your building won't have under Tall building items, and tick the others it will (standby generator, lightning protection, glazed facade). For private houses these items are suggested, not ticked.

Number of Floors set to 7 with the note: Heavier structure in use for 7 floors
The note that appears when you choose 5 or more floors.

6. Reading your results

  • Total and price range. The big figure is your estimate. Under it is a low-to-high range for your city, because prices differ between areas.
  • Sections. Substructure, superstructure, roofing & ceiling, finishes & services, external works and miscellaneous. The Professional Estimate lists every line with quantity, unit price and amount.
  • Materials vs labour. The split shows how much goes on materials, labour, specialists and fees.
  • Orange notes point at an input that looks wrong (a floor area bigger than your plot, rooms that don't fit, a plot typed in feet as metres). Check them first.
  • Amber suggestions show what you may have left out (a stronger foundation, column bases, internal columns, tall-building items) with the price of each and an Add button. Your estimate stays as you chose until you click it.
  • Edit any line. Change a quantity or unit price and the total updates. Use your own rates for every estimate with My Rates.
  • Tell us if it's off. The "Was this accurate?" buttons at the bottom go straight to us, and we check every one.

7. Downloads, saving and your project

  • PDF estimate to share with your family, bank or contractor.
  • BoQ (Professional only) in the standard format or NIQS BESMM4 format. Both have the same totals.
  • Watermark: your first watermark-free download is free with an account. After that it is ₦4,000 for 90 days (or the Pro plan), and that covers the Quotation, Invoice, Tenancy Agreement and BoQ Import tools too.
  • Save the estimate with a free account and come back to it later.
  • Start a project: turn the estimate into a budget in Track My Build and record what you spend as the building goes up.
  • Got a quote? Check it line by line in the free Quote Checker.

8. Tenders, BoQ and BEME

Bidding for a job? The Tender BoQ builds a priced bill for buildings, roads, culverts, drainage, water and electrical works. Switch Document format to BEME (Bill of Engineering Measurement and Evaluation) for numbered bills, a General Summary with contingency and VAT, and the amount in words. Contractors can price it as their bid; engineers can print it unpriced for bidders. With the unlock, download it as an editable Excel file.

Every listing on Construction Tenders has a Build a BEME button that opens the builder filled in from that tender.

9. Mistakes that make an estimate wrong

  • Plot size in feet, typed as metres. 100 × 50 in metres is 5,000 m², ten standard plots. Tap Feet first.
  • The whole building's area in one floor's box. Each floor has its own box: enter that floor only.
  • The plot size typed as the floor area. The building is smaller than the land; the estimator warns you if they match.
  • A top floor with nothing on it. If you have 3 floors, add the rooms on all 3.
  • The whole block's rooms entered as one flat. For flats, enter the rooms of one flat and the number of flats per floor.
  • Leaving out what you will build. Fence, gate, borehole, septic tank and, for tall buildings, lifts and fire safety. If it isn't ticked, it isn't priced.

10. Questions

Is the estimator free?

Yes. The Quick and Professional estimates are free and need no account. A free account lets you save estimates. Your first watermark-free PDF or BoQ is free; after that, removing the watermark costs ₦4,000 for 90 days (or the Pro plan), which also covers the Quotation, Invoice, Tenancy Agreement and BoQ tools.

How accurate is the estimate?

It prices every line from current material and labour rates for your city, so it is a good budget figure. Prices differ from one area, supplier and season to another: the results page shows a low-to-high range for your city, and you can change any quantity or price. A structural engineer's drawings and a priced BoQ give the final figure.

Why is my contractor's quote different?

Quotes differ because of the design, the specification, the contractor's margin and what is included (fence, external works, fees). Compare like with like: check the quote line by line in the free Quote Checker, which compares each line to typical prices.

Can I use my own prices?

Yes. Change any price on the results page, or save your own rates once in My Rates (free account) and price every estimate with them.

Does the estimate include land and approvals?

No. It covers the building and the external works you pick. Land, survey, building approval and legal fees are separate.

Can I get a bill of quantities (BoQ)?

Yes. From the Professional Estimate results you can download the BoQ in the standard format or in NIQS BESMM4 format, with the same totals.

How do I price a tall building?

Choose 5 floors or more. The estimator then uses a heavier structure (bigger columns lower down, deeper beams, 150 mm slabs with steel bars, wind-bracing walls, stairs on every floor) and, for shared buildings, adds lifts, fire safety, a fire escape stair and water pumps, which you can untick.

Ready to price your building?

Free, no account needed. Stuck on a step? Use the feedback buttons on the results page and we'll help.