"Borehole, complete: ₦2.5 million." "5 kVA solar, fully installed: ₦4.8 million." Specialist jobs in Nigeria are usually quoted as a single lump sum. That makes them impossible to compare, and it's how items quietly go missing: the borehole with no water test, the solar system with no surge protection, the fence with no footing worth the name.
Is this quote fair?
Upload a contractor's quote, even a photo of a handwritten one, and see each line compared with current market rates.
Check a quote →The fix is to know what a complete quote should include, and ask for a breakdown against that list. We've built six priced sample takeoffs for exactly this. Each one lists every item, measured and priced at November 2026 rates. Below is what each job should include, and the sample's total so you have a yardstick. The totals include preliminaries, contingency and 7.5% VAT where shown in the sample. Your own job will differ with size, location and spec.
Borehole
Sample: 55 m domestic borehole in Lekki, Lagos, with pump, tanks and treatment: about ₦4.4 million in all, of which the drilling, casing and pump are roughly half.
A complete borehole quote should include:
- hydrogeological survey (resistivity test) and rig mobilisation;
- drilling, priced per metre, with the depth stated;
- casing (plain) and screen (slotted), with the diameter and length of each;
- gravel pack round the screen and a cement-bentonite sanitary seal at the top;
- development (flushing until clear) and a pumping (yield) test;
- a water quality test;
- pump (size and type), riser pipe, cable and a control panel with float switch;
- tanks, tank stand, pipework to the house, treatment (filters, UV) and a well-head apron.
The items most often missing are the sanitary seal and the water test, and they're exactly the ones that decide whether the water is safe. Site the borehole at least 30 m from any septic tank or soakaway. See the borehole takeoff, or estimate yours with the Borehole Calculator.
Solar Installation
Sample: 5 kVA hybrid system with 4.5 kWp of panels and 4.8 kWh of lithium batteries for a duplex: about ₦6.6 million, with the inverter and batteries about half of it.
A complete solar quote should state:
- panel wattage, number and type (mono), and the mounting system;
- inverter size, type (hybrid / off-grid) and battery voltage;
- battery type (lithium or lead-acid), capacity in Ah and voltage, and how many;
- PV cable size and length, DC isolator, DC breaker and surge protection;
- AC breaker or changeover to your distribution board;
- earthing and lightning protection;
- installation, a separate essential-loads circuit, commissioning and handover.
Protection and earthing are the usual casualties of a cheap quote. They're also what stops a lightning strike or a fault destroying the inverter. Prices move with the exchange rate, so check them on the day. See the solar takeoff, our 5 kVA solar cost guide, or size yours with the Solar Calculator.
Septic Tank & Soakaway
Sample: two-chamber tank for about 8 people with two soakaway pits, in sandy Lekki soil: about ₦3.9 million.
A complete quote should include excavation (and support in sandy soil), blinding, a reinforced base slab, block walls filled solid, a baffle wall between chambers, waterproof render inside, a reinforced cover slab with access covers, soakaway lining with stone fill and cover slabs, soil pipes, inspection chambers and a vent. Ask how big the tank is inside. Our septic tank sizing guide shows what you need. See the septic takeoff and the Septic Tank Calculator.
Fence & Gate
Sample: 108 m perimeter of an 18 × 36 m plot, 1.8 m high block fence with RC pillars every 3 m, plastered and painted both sides, coping, razor wire and a 4 m sliding gate: about ₦12.5 million.
Check that the quote states the footing size, the block size (9" or 6"), the height, pillar spacing and their rods, whether both faces are plastered and painted, the coping, the gate size, type and steel weight, and any razor wire or lights. A fence quote that's cheap per metre is often 6" blocks, no pillars, or plaster on one side only. See the fence takeoff, our fence cost per metre guide and the Fence Cost Calculator.
Foundation (Substructure)
Sample: everything up to DPC and the ground floor slab for a 4-bedroom bungalow (16.5 × 10 m) in Abuja: about ₦10.6 million.
A complete substructure quote covers site clearance and setting out, trench excavation and carting away, blinding, the strip footing (width × depth), blockwork to DPC filled solid, DPC, laterite filling, hardcore, anti-termite treatment, DPM, mesh and the oversite slab. Foundations are the part of a building most often under-quoted, and the hardest to fix later. See the substructure takeoff and our foundation cost guide.
Landscaping & Paving
Sample: a duplex compound on a 720 m² plot with an 80 mm interlock driveway, walkways, a stamped-concrete patio, kerbs, drains, lawn, flower beds, palms and lights: about ₦11 million.
Check the paving thickness (80 mm where cars drive, 60 mm on paths), the base, kerbs, drainage falls and channels, and what "landscaping" actually means: grass, flower beds, trees, lights. See the landscaping takeoff, or add Compound Landscaping in the Building Cost Estimator and pick each item.
How to Use the Samples
- Download the matching takeoff.
- Change the dimensions on the Dimensions sheet to your job (depth, length, number of panels) and the rates to your supplier's prices.
- Ask the contractor for a breakdown in the same items, and compare line by line.
- Anything in the sample but not in the quote: ask whether it's included. If not, add it to their price before comparing.
Have a quote already? Upload it to the Quote Checker for a line-by-line comparison with current market rates. Comparing several bids? Use our guide to comparing contractor quotes.
Some rates in these samples (borehole, solar mounting and installation, some septic and fence items) are typical figures rather than surveyed prices, and are marked as such in each file. They're a checklist and a yardstick, not a quote.
Questions to Ask Each Specialist
Borehole driller
- How deep will you drill, and what do you charge per metre beyond that?
- What casing and screen, what diameter and how many metres of each?
- Is the sanitary seal included? Will you do a pumping test and a water test?
- What happens if the hole is dry or low-yield? Do I still pay in full?
Solar installer
- Which appliances is the system sized for, and for how many hours?
- Which panel, inverter and battery brands and models, with what warranties?
- Is surge protection, earthing and lightning protection included?
- Who services the system, and how quickly do you respond to faults?
Septic and fence builders
- What are the internal tank dimensions? Are the walls filled solid and rendered with a waterproofer?
- For a fence: what footing size, block size, pillar spacing and rods? Plastered and painted both sides?
Frequently Asked Questions
Why do specialists quote a lump sum?
Partly habit, and partly because it's simpler to sell. A lump sum isn't wrong in itself. The problem is not knowing what's in it. Ask for the breakdown, or at least a written list of what's included.
Are the sample prices what I should pay?
They're a yardstick for the example job, not a quote. Depth, location, access, brands and your supplier's prices all change the figure. Change the quantities and rates in the sample to match your job and compare again.
Can I check a quote that's only a WhatsApp photo?
Yes. The Quote Checker reads photos of handwritten quotes as well as typed ones.
Download the Sample Takeoffs
Six free priced takeoffs (Excel + PDF): Borehole, Solar, Septic & Soakaway, Fence & Gate, Foundation and Landscaping. Change any quantity or rate and they reprice.
See the takeoffs →