Your Company
| Quote No: | |
| Date: |
PREPARED FOR
—
| Description | Qty | Unit | Rate (₦) | Amount (₦) |
|---|---|---|---|---|
| — | 1 | item | 0.00 | 0.00 |
| Subtotal | ₦0.00 |
| TOTAL QUOTE | ₦0.00 |
Itemised contractor quotations with validity dates, VAT and one-click conversion to an invoice.
Include if you want payment terms on the quotation.
Live preview
draftYour company
Phone · email
QUOTATION
Prepared for
—
Valid until
—
Printed copy includes a small watermark
Printed quote includes a watermark
Remove it with a one-time payment.
BOQ + Quotation + Invoice + Estimator + Tenancy Agreement + BOQ Import
All 6 tools — watermark-free for 90 days
₦4,000
one-time
Log in to save quotations
Add at least one line item to save
Save quotation first
Once the quote is accepted…
Price the job with the Estimator or a full BOQ, then invoice or track the build.
Spreadsheet import
Import them as a CSV file — the file is read in your browser and never uploaded.
In Excel or Google Sheets, use File → Save As (or Download) → CSV. Keep one row per item.
Description, Quantity, Unit and Rate. Headers can be named loosely — 'Item', 'Qty', 'Price' all work. No header? We read them in that order.
Units like m2, nos or bags are matched to the form's units. Review the lines, add VAT if needed, then save, print or send.
Have a priced Excel BoQ in any layout? BoQ Import reads Excel files directly.
Start faster
Load a typical list of work items, then fill in your own quantities and rates. Rates start blank — you know your prices.
A complete house priced section by section — the way most Nigerian building quotes are laid out.
Block fence with pillars, plaster, coping and a steel gate.
Plaster, screed, tiles, ceiling, paint, doors and windows.
Timber, roofing sheets, fascia, gutters and ceiling.
Pricing
Building quotations is free. Remove the watermark when you need a clean copy.
Free
₦0
Create, save and print quotations. Printed copies carry a small watermark.
90-day pass
₦4,000
one payment · 90 days
All 6 tools watermark-free for 90 days — quotations, invoices, BoQ, estimator, tenancy agreements and BoQ import.
7-day pass
₦500
one-time · 7 days
All 6 document tools watermark-free for a week — ideal for a one-off job.
See the 7-day passBuilt for contractors
Itemised quantities, units and rates show the client exactly what they are paying for — no lump sums that hide cement or rod prices.
Material prices move fast in Nigeria. A "valid until" date protects you when cement or iron rod prices change before the client accepts.
When the client accepts, turn the quotation into an invoice in one click instead of typing it all again.
Questions
Yes — create, save and print quotations free. Free printouts carry a small nigeriabuildingcost.ng watermark; a 7-day or 90-day pass removes it.
Yes. Save your sheet as a CSV file with description, quantity, unit and rate columns and import it — the file is read in your browser, not uploaded. You can also import section totals from a saved BoQ tender.
Each preset adds a typical list of work items with sensible units. Rates start blank because every contractor prices differently — fill in your own quantities and rates.
Yes. Tick "Include VAT" and 7.5% is added and shown as a separate line.
Mark the quotation as accepted and convert it into an invoice in one click — the client, items and totals carry over.