Calculate the number of fence panels and posts needed for any perimeter length.
One post per panel end plus one closing post; ~0.02 m³ concrete per post hole
Panels needed equals total length divided by panel width, rounded up. Posts are always one more than the number of panels — one post at each end of every panel, plus one closing post. Each post hole requires approximately 0.02 m³ of concrete for a standard 75–100mm post in Nigerian soils.
Panels = ceil(Length / Panel width) Posts = Panels + 1 Concrete (m³) = Posts × 0.02
Block Wall Estimator
Estimate blocks, mortar and reinforcement for a standalone garden or compound block wall.
Driveway Estimator
Calculate the concrete volume and materials needed for a residential or commercial driveway slab.
Shed Base Estimator
Calculate concrete materials or paving slabs for a solid, level shed or outhouse base.
Use our AI estimator for a complete cost breakdown of your build.