Free, ready-made construction templates for Nigeria. Editable Excel files with working formulas (BoQ, estimates, schedules, site reports, invoices and more), plus sample contracts and tenancy agreements.
Library
Compound landscaping for a duplex on a 720 m² plot: laterite filling and topsoil, 80 mm interlock driveway and parking, 60 mm walkways, a stamped-concrete patio, kerbs, surface drains, carpet-grass lawn, flower beds and hedges, palms, decorative gravel and compound lights.
A 5 kVA hybrid solar system for a duplex: 10 × 450 W panels with mounting, a 48 V hybrid inverter, lithium battery bank and rack, PV cable, DC and AC protection, earthing and lightning arrester, installation, an essential-loads circuit and commissioning.
A domestic borehole measured item by item: survey, rig mobilisation, drilling to 55 m, uPVC casing and screen, gravel pack, sanitary seal, development, yield and water-quality tests, submersible pump with riser and cable, control panel, tanks on a steel stand, pipework and treatment. Use it to check a driller's lump-sum quote line by line.
A two-chamber septic tank for a 4-bedroom duplex with two soakaway pits: excavation in sandy soil, base and cover slabs with reinforcement, block walls filled solid, waterproof render, baffle wall, honeycomb pit lining, stone fill, manhole covers, soil pipes and inspection chambers.
A perimeter fence for one standard plot: trench and strip footing, RC pillars every 3 m with their rods and links, 1.8 m of 9" blockwork, plaster and paint to both faces, coping, razor wire, a 4 m sliding gate, pedestrian gate and gate lights. Change the boundary length on the Dimensions sheet and the whole fence reprices.
Everything below the ground floor of a 4-bedroom bungalow: site clearance, setting out, trench excavation, blinding, strip footings, blockwork to DPC filled solid, DPC, laterite and hardcore filling, anti-termite treatment, DPM, BRC mesh and the oversite slab. The part of a building most often under-quoted — this shows every item a foundation quote should include.
Air-conditioning for a shopping plaza in Owerri: split units by shop, refrigerant pipework, condensate drains, outdoor-unit brackets, isolators, extract fans to toilets, and testing and commissioning — the Nigerian equivalent of an HVAC takeoff.
Plumbing and sanitary work for a 4-bedroom duplex: sanitary fittings by bathroom, hot and cold water pipework, soil and waste pipes, manholes, septic tank, soakaway, overhead tank and pump.
The electrical installation for a 4-bedroom duplex, counted room by room: lighting, switch, socket, AC, cooker and water-heater points, conduit and cable runs, distribution boards, changeover, earthing, external lights and testing.
Painting for six flats and the common areas: wall areas per flat (girth × height less openings), ceilings, external walls, gloss paint to doors and railings, with primer, number of coats and litres of paint.
Floor and wall finishes for a 4-bedroom duplex measured room by room: floor screed, porcelain and ceramic floor tiles, skirting, wall tiles to kitchens and bathrooms with door and window deductions, and stair tread tiling.
A door and window schedule for six 3-bedroom flats: security doors, panel and flush doors with frames and ironmongery, aluminium casement and sliding windows, burglar-proofing and louvre windows to wet areas, counted type by type.
Waterproofing for a block of flats in Port Harcourt: DPM and DPC, flat-roof and balcony membranes, wet-area waterproofing under tiles, water-tank stand, plus sealant joints round windows, door frames and sanitary fittings, measured in m² and linear metres.
Roof covering for a two-storey duplex in Lagos: 0.55 mm long-span aluminium sheets (slope area with overhangs), ridge, hip and valley flashings, fascia, soffit, gutters, downpipes and outlets.
Roof carpentry for a 4-bedroom hip-roof bungalow in Abuja: wall plates, rafters, struts, ties, purlins, ridge and hip boards, fascia and noggins, scheduled piece by piece in metres and converted to 12 ft lengths of 2" × 4", 2" × 6" and 2" × 3" hardwood, with anti-termite treatment and fixing.
Ceilings and drywall partitions for the upper floor of a shopping plaza fitted out as offices: POP ceilings with cornices and drops, 600 × 600 suspended ceiling tiles, gypsum board partitions on metal studs and bulkheads, measured room by room.
A 30 × 20 m steel portal-frame warehouse in Ibadan measured member by member: rafters, columns, haunches, purlins, side rails, bracing, base plates and holding-down bolts — number × length × kg/m — with fabrication, painting and erection priced per kg, plus roof and wall sheeting.
Sandcrete blockwork for a two-storey duplex: 9" external and 6" internal walls measured floor by floor as girth × height, with every door and window opening deducted. Shows the block count (10 blocks per m²), cement and sand for mortar, and labour. Nigeria's equivalent of a masonry / CMU takeoff.
Reinforced concrete for a two-storey duplex frame in Lekki, Lagos: pad bases, ground beams, columns, first-floor beams and slab, staircase and lintels. Concrete in m³, formwork in m², and reinforcement scheduled bar by bar (number × length × kg/m) for Y8 to Y16. The bar schedule format makes it easy to check an iron-bender's quantities.
The civil and external works for a block of flats in Port Harcourt: site levelling, a concrete U-drain round the building, culvert crossings, interlocking paving to the car park, kerbs, a 1.8 m block fence with gate, septic tank and soakaway, and a borehole with overhead tank.
External finishes for a three-storey block of six flats in Port Harcourt: external render, textured (Texcote-type) coating, stone cladding to the ground floor, ACP fascia band, window sills, balcony railings and soffits, measured elevation by elevation with openings deducted.
A façade repair takeoff for a two-storey shopping plaza in Owerri: access scaffold, hacking off defective render, crack stitching, concrete spalling repairs to the canopy, re-rendering, algae treatment, re-sealing windows, new ACP fascia and repainting. Shows how to measure repair work elevation by elevation, with areas of patch repair kept separate from full re-rendering.
The preliminaries bill for a 12-month build of six 3-bedroom flats in Port Harcourt: site setup, hoarding, site office and store, temporary power and water, scaffolding, security, supervision staff, insurance, bonds, tests and clean-up. Time-related items are measured in months or weeks so you can see how a programme overrun changes the cost.
A remodelling takeoff for an occupied 3-bedroom flat in Surulere, Lagos: strip-out and disposal, wall removal for an open-plan kitchen, new partitions, replastering, re-tiling, POP ceilings, new doors, rewiring, bathroom refits and repainting. Shows how demolition, making good and new work are measured separately so nothing is missed on a renovation quote.
A full building takeoff for a two-storey 4-bedroom duplex in Lekki, Lagos (336 m²): pad and strip foundations, RC frame, suspended slab, staircase, blockwork, roof, openings, finishes and services, measured floor by floor. Shows how a Nigerian QS sets out a house takeoff — measurement on the Dimensions sheet, priced quantities carried to a summary. Use it as a checklist for your own drawing takeoff.
A complete measured and priced estimate for a 4-bedroom bungalow (165 m²) in Lugbe, Abuja: substructure, frame and blockwork, roof, doors and windows, finishes, services and external works. Every quantity is worked out on the Dimensions sheet (timesing × length × width × height, with openings deducted) and carried to the Priced Takeoff, then to a Summary with preliminaries, contingency and VAT. Change any dimension or rate and everything recalculates.
Make your own
These samples are fixed. Our free generators create a document filled in with your names, figures and terms — ready to print or send.
Your landlord, tenant, rent and governing state — with Nigerian notice-to-quit terms.
Open generator →02A trade-by-trade bill of quantities with your company name, markup and contract sum.
Open generator →03Itemised quotes with validity dates and VAT — convert to an invoice when accepted.
Open generator →04Contractor invoices with VAT, stage billing by construction stage and payment details.
Open generator →Pricing
Everything on this page costs nothing. Documents you create with our generators carry a small watermark unless unlocked.
Free
₦0
All sample downloads, plus every generator — printed documents carry a small watermark.
90-day pass
₦4,000
one payment · 90 days
All 6 tools watermark-free for 90 days — tenancy agreements, quotations, invoices, BoQ, estimator and BoQ import.
See the 90-day pass7-day pass
₦500
one-time · 7 days
All 6 document tools watermark-free for a week — ideal for a one-off job.
See the 7-day passQuestions
Yes. You can preview every sample without an account. Downloading the file is free too — it just needs a free account, which takes under a minute.
They are general reference templates. Read them carefully and adapt them to your project — and for contracts and tenancy agreements, have a qualified lawyer review the final version before anyone signs.
Yes. Use one of our free generators — tenancy agreement, tender BoQ, quotation or invoice — to create a document with your own names, figures and terms, ready to print or send.
Each card shows the file type and size before you download. Contracts and agreements are PDFs. The construction templates are editable Excel (.xlsx) files with working formulas, and each has a PDF preview you can view first.