Your Company
| Invoice No: | |
| Date: |
BILL TO
—
| Description | Qty | Unit | Rate (₦) | Amount (₦) |
|---|---|---|---|---|
| — | 1 | item | 0.00 | 0.00 |
| Subtotal | ₦0.00 |
| TOTAL DUE | ₦0.00 |
NOTES
Payment is due within 30 days of invoice date. Please quote invoice number on all payments.
Create professional contractor invoices — VAT, Naira formatting and payment tracking built in.
Live preview
draftYour company
Phone · email
INVOICE
Bill to
—
Due
—
Printed copy includes a small watermark
Printed invoice includes a watermark
Remove it with a one-time payment or a Pro subscription.
BOQ + Quotation + Invoice + Estimator + Tenancy Agreement + BOQ Import
All 6 tools — watermark-free for 90 days
₦4,000
one-time
Secured by Paystack
Pro Subscription
All tools watermark-free + unlimited estimates
₦2,500
per month
Log in to save invoices
Add at least one line item to save
Save invoice first to enable sending
Also need to price the job?
Estimate the cost, build a tender BOQ, or track the site before you invoice.
Stage billing
Enter your contract sum, adjust each stage's share to match your contract, and add it to the invoice as a line item.
Setting out, excavation, foundation concrete, blockwork to DPC and the ground-floor slab.
—
Blockwork, columns, lintels, beams and any suspended slabs or staircase.
—
Wall plates, trusses, roofing sheets, fascia, gutters and ceiling.
—
Plastering, tiling, painting, doors and windows, electrical and plumbing.
—
Starting percentages are typical stage shares from our Building Cost Estimator for a standard bungalow — your contract's payment schedule takes priority.
Pricing
Creating invoices is free. Remove the watermark when you need a clean copy.
Free
₦0
Create, save and print invoices. Printed copies carry a small watermark.
90-day pass
₦4,000
one payment · 90 days
All 6 tools watermark-free for 90 days — invoices, quotations, BoQ, estimator, tenancy agreements and BoQ import.
7-day pass
₦500
one-time · 7 days
All 6 document tools watermark-free for a week — ideal for a one-off job.
See the 7-day passBuilt for contractors
Bill by m², m³, bags, tonnes, days or lots — not just "item" — so your invoice matches how the work was measured.
Switch on VAT and 7.5% is added and shown as its own line, with the total updated automatically.
Pull the section totals from a saved BoQ tender straight in as line items, or bill stage by stage.
Questions
Yes — you can create and print invoices free. Free printouts carry a small nigeriabuildingcost.ng watermark; a 7-day or 90-day pass removes it.
Yes. Tick "Include VAT" and 7.5% is added to the subtotal and shown as a separate line on the invoice.
Yes. Enter your contract sum under "Bill by construction stage", adjust the percentage for each stage, and add it as a line item — one invoice per stage, or several stages on one invoice.
No. This is an invoicing tool only — we never process, collect or hold payments. Your client pays you directly using the bank details on your invoice.
Yes. Log in and save the invoice, then send it to your client by email or copy a payment link to share on WhatsApp.