Calculate cement bags for sand-cement render, or the number of plasterboards for dry-lining.
1:3 cement:sand plaster mix; plasterboard = 1.2×2.4m = 2.88 m²
Render volume is surface area multiplied by thickness. For a 1:3 cement-to-sand mix — standard in Nigeria — approximately 12 bags of cement are needed per cubic metre of render. Plasterboard count is total area divided by 2.88 m² (the size of a standard 1200×2400mm board), rounded up.
Volume (m³) = Area × (Thickness / 1000) Cement bags = Volume × 12 Boards = ceil(Area / 2.88)