ClosedBuildings

Construction of a modern abattoir at Bauchi LGA, Bauchi State

Bauchi L-PRESBauchi, Bauchi State

The Bauchi State office of the Livestock Productivity and Resilience Support Project wants a contractor to build a modern abattoir in Bauchi LGA. It is one package with a six-month work period, funded by a World Bank credit. Any eligible bidder may apply, but the margin of preference will not be applied.

Bidding closed

Fri 14 Aug 2026, 11:00am

Kept as a record of what was tendered.

Price this bid

Free BoQ, project details filled in · free account

Key details

Procuring entity
Bauchi L-PRES
Location
Bauchi, Bauchi State
Reference
NG-BAUCHI L-PRES-561851-CW-RFB
Published
14 Aug 2026
Method
Request for Bids
Tender fee
NGN100,000 non-refundable
Bid security
NGN16,394,728.05

Our rough guide

our estimate, not from the notice

Construction period

6 months

Use it to judge whether the job fits your company, then price it properly.

Your bid plan

  1. 1

    Read the official notice

    Check the scope, eligibility and dates on the source. Our summary is a guide.

  2. 2

    Get the bidding documents

    Send a written application to the Bauchi State project office and pay the NGN100,000 fee by bank draft or direct transfer to the L-PRES draw-down account at FCMB, then present proof of payment at the office. Bids must be sealed and delivered to the State Project Coordination Office on Old GRA, Jos Road, Bauchi by 11:00am on 15 September 2026; electronic bids are not accepted.

    Fee: NGN100,000 non-refundable

  3. 3

    Prepare your documents

    6 items asked for. Tick them off below as you gather them.

  4. 4

    Price your bid

    Build a priced BoQ with your rates, markup and contingency.

    Price this bid →
  5. 5

    Closed Fri 14 Aug 2026, 11:00am

    Include bid security: NGN16,394,728.05.

Documents checklist

0 / 6 ready

Ticks are saved on this device only.

Source: World Bank procurement notices. The description is written by us from the official notice. Always confirm the dates, requirements and submission details in the official notice and bidding documents before you bid.