Labour Cost Calculator

Nigerian Building Labour Cost Calculator

Get trade-by-trade labour costs for your building project in Nigeria — block layers, plasterers, tilers, plumbers, electricians and every other trade involved.

💾 Save & exportSave what you typed, or download the result as PDF or Excel.

Quick-fill loads typical quantities for the selected building type. Adjust any row to match your actual project.

Foundation Works₦0
TradeUnitRateQuantityTotal
Excavation Workerdays₦5,000—
Iron Bender (foundation)days₦9,000—
Carpenter (formwork)days₦10,000—
Concrete Workerdays₦5,000—
General Labourerdays₦5,000—
Block Work₦0
TradeUnitRateQuantityTotal
Block Layerblocks₦150—
Block Tender (asst)days₦5,000—
Iron Bender (columns)days₦9,000—
Roofing₦0
TradeUnitRateQuantityTotal
Carpenter (roof timber)days₦10,000—
Roofer / Sheet Fixerdays₦10,000—
Roofing Labourerdays₦5,000—
Plastering₦0
TradeUnitRateQuantityTotal
Plastererm²₦1,500—
Plasterer Assistantdays₦5,000—
Tiling₦0
TradeUnitRateQuantityTotal
Floor Tilerm²₦1,800—
Wall Tilerm²₦2,200—
Painting₦0
TradeUnitRateQuantityTotal
Painter (emulsion)m²₦1,200—
Plumbing₦0
TradeUnitRateQuantityTotal
Plumberdays₦10,000—
Plumber Assistantdays₦5,000—
Electrical₦0
TradeUnitRateQuantityTotal
Electriciandays₦10,000—
Electrician Assistantdays₦5,000—
Finishing Works₦0
TradeUnitRateQuantityTotal
Aluminium Installerdays₦10,000—
POP Ceiling Installerm²₦2,500—
Carpenter (doors/fittings)days₦10,000—
Welder (gates/rails)days₦10,000—
Supervision₦0
TradeUnitRateQuantityTotal
Site Foreman / Supervisordays₦15,000—

Save this to your build budget

Keep this figure instead of working it out again next time. Each calculator adds a line to your project's budget, and running it again updates that line. Setting up a budget is free and doesn't start your trial.

Note: These are labour-only rates for 2026. Material costs are separate — use the full estimator for a complete Bill of Quantities including materials. Rates are sourced from Nigerian construction market data and adjusted for location. Actual rates on your site may vary by 10–20% depending on contractor experience and project complexity.

Need materials + labour in one estimate?

The full estimator generates a complete Bill of Quantities with both materials and labour — itemised by trade, ready for your contractor.

Generate Full Estimate →